Program evaluation and review technique

Index Program evaluation and review technique

The program (or project) evaluation and review technique, commonly abbreviated PERT, is a statistical tool, used in project management, which was designed to analyze and represent the tasks involved in completing a given project. [1]

37 relations: Activity diagram, Aerospace manufacturer, Arrow diagramming method, Beta distribution, Bibliography, Booz Allen Hamilton, Critical path method, Dependency (project management), DuPont, Duration (project management), Estimation (project management), Float (project management), Fordism, Gantt chart, Graphical Evaluation and Review Technique, Grenoble, Harold Bright Maynard, Harold Kerzner, Librarian, Lockheed Martin Space Systems, Precedence diagram method, PRINCE2, Project, Project management, Project network, Project planning, Schedule (project management), Scientific management, Task (project management), Theory of constraints, Triangular distribution, UGM-27 Polaris, United States Navy, United States Navy Special Projects Office, Willard Fazar, Work breakdown structure, 1968 Winter Olympics.

Activity diagram

Activity diagrams are graphical representations of workflows of stepwise activities and actions with support for choice, iteration and concurrency.

New!!: Program evaluation and review technique and Activity diagram · See more »

Aerospace manufacturer

An aerospace manufacturer is a company or individual involved in the various aspects of designing, building, testing, selling, and maintaining aircraft, aircraft parts, missiles, rockets, or spacecraft.

New!!: Program evaluation and review technique and Aerospace manufacturer · See more »

Arrow diagramming method

Arrow diagramming method (ADM) is a network diagramming technique in which activities are represented by arrows.

New!!: Program evaluation and review technique and Arrow diagramming method · See more »

Beta distribution

In probability theory and statistics, the beta distribution is a family of continuous probability distributions defined on the interval parametrized by two positive shape parameters, denoted by α and β, that appear as exponents of the random variable and control the shape of the distribution.

New!!: Program evaluation and review technique and Beta distribution · See more »

Bibliography

Bibliography (from Greek βιβλίον biblion, "book" and -γραφία -graphia, "writing"), as a discipline, is traditionally the academic study of books as physical, cultural objects; in this sense, it is also known as bibliology (from Greek -λογία, -logia).

New!!: Program evaluation and review technique and Bibliography · See more »

Booz Allen Hamilton

Booz Allen Hamilton Inc. (informally: Booz Allen) is an American management and information technology consulting firm, sometimes referred to as a government-services company, headquartered in McLean, Virginia, in Greater Washington, D.C., with 80 other offices around the globe.

New!!: Program evaluation and review technique and Booz Allen Hamilton · See more »

Critical path method

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities.

New!!: Program evaluation and review technique and Critical path method · See more »

Dependency (project management)

In a project network, a dependency is a link amongst a project's terminal elements.

New!!: Program evaluation and review technique and Dependency (project management) · See more »

DuPont

E.

New!!: Program evaluation and review technique and DuPont · See more »

Duration (project management)

Duration of a project's terminal element is the number of calendar periods it takes from the time the execution of element starts to the moment it is completed.

New!!: Program evaluation and review technique and Duration (project management) · See more »

Estimation (project management)

In project management (e.g., for engineering), accurate estimates are the basis of sound project planning.

New!!: Program evaluation and review technique and Estimation (project management) · See more »

Float (project management)

In project management, float or slack is the amount of time that a task in a project network can be delayed without causing a delay to.

New!!: Program evaluation and review technique and Float (project management) · See more »

Fordism

Fordism is the basis of modern economic and social systems in industrialized, standardized mass production and mass consumption.

New!!: Program evaluation and review technique and Fordism · See more »

Gantt chart

A Gantt chart is a type of bar chart that illustrates a project schedule, named after their inventor, Henry Gantt (1861–1919), who designed such a chart around the years 1910–1915.

New!!: Program evaluation and review technique and Gantt chart · See more »

Graphical Evaluation and Review Technique

Graphical Evaluation and Review Technique, commonly known as GERT, is a network analysis technique used in project management that allows probabilistic treatment both network logic and estimation of activity duration.

New!!: Program evaluation and review technique and Graphical Evaluation and Review Technique · See more »

Grenoble

Grenoble is a city in southeastern France, at the foot of the French Alps where the river Drac joins the Isère.

New!!: Program evaluation and review technique and Grenoble · See more »

Harold Bright Maynard

Harold Bright Maynard (Oct. 18, 1902 - 1975) was an American industrial engineer, consulting engineer at the Methods Engineering Council, and management author.

New!!: Program evaluation and review technique and Harold Bright Maynard · See more »

Harold Kerzner

Harold Kerzner (born ca 1940) is an American engineer, management consultant, Emeritus Professor of Systems Management at Baldwin Wallace University, and Sr.

New!!: Program evaluation and review technique and Harold Kerzner · See more »

Librarian

A librarian is a person who works professionally in a library, providing access to information and sometimes social or technical programming.

New!!: Program evaluation and review technique and Librarian · See more »

Lockheed Martin Space Systems

Lockheed Martin Space is one of the four major business divisions of Lockheed Martin.

New!!: Program evaluation and review technique and Lockheed Martin Space Systems · See more »

Precedence diagram method

The precedence diagram method (PDM) is a tool for scheduling activities in a project plan.

New!!: Program evaluation and review technique and Precedence diagram method · See more »

PRINCE2

PRINCE2 (PRojects IN Controlled Environments) is a structured project management method and practitioner certification programme.

New!!: Program evaluation and review technique and PRINCE2 · See more »

Project

Contemporary business and science treat as a project any undertaking, carried out individually or collaboratively and possibly involving research or design, that is carefully planned (usually by a project team) to achieve a particular aim.

New!!: Program evaluation and review technique and Project · See more »

Project management

Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time.

New!!: Program evaluation and review technique and Project management · See more »

Project network

A project network is a graph (weighted directed graph) depicting the sequence in which a project's terminal elements are to be completed by showing terminal elements and their dependencies.

New!!: Program evaluation and review technique and Project network · See more »

Project planning

Project planning is part of project management, which relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment.

New!!: Program evaluation and review technique and Project planning · See more »

Schedule (project management)

In project management, a schedule is a listing of a project's milestones, activities, and deliverables, usually with intended start and finish dates.

New!!: Program evaluation and review technique and Schedule (project management) · See more »

Scientific management

Scientific management is a theory of management that analyzes and synthesizes workflows.

New!!: Program evaluation and review technique and Scientific management · See more »

Task (project management)

In project management, a task is an activity that needs to be accomplished within a defined period of time or by a deadline to work towards work-related goals.

New!!: Program evaluation and review technique and Task (project management) · See more »

Theory of constraints

The theory of constraints (TOC) is a management paradigm that views any manageable system as being limited in achieving more of its goals by a very small number of constraints.

New!!: Program evaluation and review technique and Theory of constraints · See more »

Triangular distribution

In probability theory and statistics, the triangular distribution is a continuous probability distribution with lower limit a, upper limit b and mode c, where a \left.\begin f(x) &.

New!!: Program evaluation and review technique and Triangular distribution · See more »

UGM-27 Polaris

The UGM-27 Polaris missile was a two-stage solid-fueled nuclear-armed submarine-launched ballistic missile.

New!!: Program evaluation and review technique and UGM-27 Polaris · See more »

United States Navy

The United States Navy (USN) is the naval warfare service branch of the United States Armed Forces and one of the seven uniformed services of the United States.

New!!: Program evaluation and review technique and United States Navy · See more »

United States Navy Special Projects Office

United States Navy Special Projects Office (SPO) is a former research and design office of the United States Navy, responsible for the coordination of the development and design of the US Navy Fleet Ballistic Missiles (FBM) Polaris and Poseidon.

New!!: Program evaluation and review technique and United States Navy Special Projects Office · See more »

Willard Fazar

Willard R. Fazar (March 16, 1915 - September 13, 1997) was an American economist, Head of the Program Evaluation Branch at Special Projects Office, U.S. Navy, and author.

New!!: Program evaluation and review technique and Willard Fazar · See more »

Work breakdown structure

A work-breakdown structure (WBS) in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components.

New!!: Program evaluation and review technique and Work breakdown structure · See more »

1968 Winter Olympics

The 1968 Winter Olympics, officially known as the X Olympic Winter Games (Les Xes Jeux olympiques d'hiver), were a winter multi-sport event which was celebrated in 1968 in Grenoble, France, and opened on 6 February.

New!!: Program evaluation and review technique and 1968 Winter Olympics · See more »

Redirects here:

Activity on arrow, Critical path network diagram, Network diagram (project management), PERT, PERT Chart, PERT chart, Performance, Evaluation, and Review Technique, Pert Chart, Pert chart, Program Evaluation & Review Technique, Program Evaluation and Review Technique, Program evaluation and review technique (PERT), Programme Evaluation and Review Technique.